top of page

CSD Projects and Platforms

The Oak Flat booster station was just completed in the spring of 2026.

You've seen the water leaks in the street. Those are usually from leaks in a service line that goes from the main waterline to a property parcel. Our crews do a great job but there are a lot of leaks! These service lines need to be replaced, which takes money.

This 20-foot section of main line pipe was replaced after the main line ruptured.

Our aging system is in immediate need replacement. 

These are the new variable frequency drive pumps at the recently completed Oak Flat booster station. The project began under the previous General Manager. 

bottom of page